Morris Adjmi Architects

Tampa EDITION's Exterior Work Reaches Final Stages | YIMBY

Exterior work has entered the final stages on the Tampa EDITION, the 27-story mixed-use skyscraper we designed for Strategic Property Partners within the 56-acre Water Street Tampa mega-development in Downtown Tampa.

Recent photos show the current state of the ongoing exterior work at the tower, where the concrete balcony slabs and perimeter columns are being painted in white stucco to match the other completed elevations. The exterior hoist, which once stood along the northern facade of the superstructure, has been completely disassembled and floor-to-ceiling glass panels are filling in the gaps it left behind.

View Article on YIMBY